The MTR Siu Ho Wan project invites tenders for occupancy in 2030

28Hse Editor  2022-12-12  #Transaction
And social welfare facilities, and a large public transport interchange and seaside promenade, the community population is expected to reach 60,000 to 70,000, which is comparable to the scale of Tseung Kwan O Lohas Park. The first phase of residences will be located at the entrance of Siu Ho Wan Station, directly connected to the Siu Ho Wan shopping mall below.

Tang Chi-fai revealed that Siu Ho Wan Shopping Center will be positioned as a "medium-sized shopping mall". Its leasing and design planning will be based on the daily life of residents. It has not yet considered introducing high-end retail tenants. It will aim to "serve residents as soon as possible" and will be opened in stages. shopping mall. In addition, Deng Zhihui pointed out that the demolition of Pavillion Village III in Tai Wai has been completed and the reconstruction has started. There is a new key date and the replacement of the contractor. It is believed that the quality of this reconstruction will meet the standard.

Disclaimer: All wordings and pictures which indicated 28HSE editor are the copyright of 28HSE LIMITED. Acknowledgement is required if other parts of this publication are used. The content is for reference only, does not constitute investment advice and it does not mean that 28HSE agreed the points. The area which show in the article is salable area if there is no special circumstances. The pictures is for reference also.

Share by Facebook

Share by Whatsapp

Share by email